Campus Construction Notices:

Completed Projects


Health and Science building entrance

Health and Science Building

The Lower Columbia College Health and Science Building houses all LCC healthcare and science programs. The new HSB building replaced three older vocational and science buildings, consolidating programs under a single roof for the first time in the college's 80-year history. 

Technology-enabled classrooms and labs, outfitted with the latest in scientific equipment, prepare students for in-demand careers in science, engineering, nursing, and other healthcare fields.

Myklebust Gymnasium

Myklebust Gymnasium and Fitness Center

Students led the effort to renovate the Gym & Fitness Center through a fee of $2.50 per credit in tuition. The project was completed in 2014. It supports the current and future instructional needs of the college, brings the entire facility into ADA compliance, and doubles the space available for athletic activities, health-related classes and activities, and other uses. Building house programs such as Red Devils Athletics, Physical Education, and Continuing Education.

front entrance of indoor sports facility woth large truck doors.

LCC Athletic Training Center

Lower Columbia College boasts the premier junior college men’s baseball program in the Northwest. Our historic Story Field at the heart of our campus is beloved by the thousands of athletes and visitors who use it every year. Now 60 years old, we must address limitations by improving grandstands, lighting, and the entrance. 

Additionally, the College shares many outdoor athletic facilities with area clubs and schools, and as a result, these facilities are heavily used and long overdue for upgrades and maintenance. Now is the time to invest in facilities for the LCC women’s soccer team and women’s softball team, in partnership with the community, to provide year-round, accessible fields and amenities that will allow them to reach their potential. 


Looking for a real-time resource for employees (and students) about construction projects at LCC? Click the link below to get up-to-date information on campus projects.

 

 

 


Buildings & Facilities Contacts

Plant Operations

  Richard Hamilton, Director, Campus Services

  (360) 442-2263
  rhamilton@lowercolumbia.edu

Media

  Wendy Hall, Vice President, Effectiveness & College Relations

  (360) 442-2491
  whall@lowercolumbia.edu

Rental

  Alyssa Milano-Hightower, RCA Director of Operations

  (360) 442-2511
  amilanohightower@lowercolumbia.edu